1 · Project
2 · Import ground levels (OGL)
Columns: Chainage, Offset, Level (one row per point; offset left negative). Upload Excel/CSV/TXT or paste below.
Edit cells directly, or click a cell and paste (Ctrl+V) a block from Excel to replace the table.
| Chainage | Offset | Level |
|---|
3 · Import finished levels
Slope / vertical to ground, per chainage range and per side. Leave the last "To" blank for "end". Fill = embankment slope H:1V, Cut = cutting slope H:1V (ignored when Vertical).
| From Ch | To Ch | Left end | L fill | L cut | Right end | R fill | R cut |
|---|
Columns: Chainage, Offset, Level of the finished road surface.
Edit cells directly, or click a cell and paste (Ctrl+V) a block from Excel to replace the table.
| Chainage | Offset | Level |
|---|
Cross sections
Longitudinal section
Volume statement (average end area)
Download
Downloads are charged per km. Viewing above is free.